• Gold: 1,525.51 -3.03
  • Silver: 17.37 -0.09
  • Euro: 1.113 -0.001
  • USDX: 97.64 -0.647
  • Oil: 53.65 -1.71

SilverCrest Reports Further Continuous High Grade Underground Results At Las Chispas; Extends Surface Drilling Program

SilverCrest Metals Inc. (“SilverCrest” or the “Company”) is pleased to report on additional results from the ongoing underground channel sampling program and extension of its surface drilling program at its Las Chispas Project (“Las Chispas”) located in Sonora, Mexico. Las Chispas is a historic silver-gold district with over six kilometres of existing underground workings, which apparently were not previously drilled before their acquisition by the Company. The project is in a prolific mining area which currently hosts two nearby precious metal operations.

Fortuna Silver Mines to Acquire Goldrock Mines

Fortuna Silver Mines Inc. (FSM) (FVI.TO) ("Fortuna", the "Company") and Goldrock Mines Corp. (TSX VENTURE: GRM) ("Goldrock") are pleased to announce that they have entered into a definitive agreement (the "Arrangement Agreement") pursuant to which Fortuna has agreed to acquire all of the issued and outstanding common shares of Goldrock (the "Arrangement"). Goldrock's principal asset is the 100% owned Lindero Project located in Salta Province, Argentina. The Lindero Project is an open pit, heap leach gold project with a completed 2016 feasibility study which has been granted the environmental permit necessary for development of the project.

Silver Standard, Golden Arrow forge ahead at Chinchillas

Silver Standard Resources (TSX: SSO; NASDAQ: SSRI) is moving forward on pre-development studies that may lengthen mine life at its Pirquitas silver mine in northern Argentina's Jujuy province, by combining material from Golden Arrow Resources' (TSXV: GRG; US-OTC: GARWF) Chinchillas silver-lead-zinc project, located 35 km northeast.

Golden Arrow Initiates Next Phase of Drilling in Pre-Development Program at Chinchillas Silver Project, Argentina

Golden Arrow Resources Corporation (TSX-V: GRG, FRA: GAC (WKN: A0B6XQ), "Golden Arrow" or the "Company") is pleased to announce that it has commenced a 6,500 metre Phase VI drilling and exploration program at the Chinchillas silver project in Jujuy Province, Argentina. The drill program will focus on exploration and condemnation drill holes, as well as infill holes as necessary.

Fortuna Reports Consolidated Financial Results for the First Quarter 2016

"We have made a strong start to the year operating well within our production and cost targets and look forward to the commissioning of our key expansion project at the San Jose Mine in July." Mr. Ganoza continued, "At San Jose's new production rate of 3,000 tpd, the company will target total annual consolidated production of approximately nine million ounces of silver and fifty-two thousand ounces of gold, with an AISCC below $9.0 per ounce of silver."

Fortuna to Release First Quarter Financial Results on May 9, 2016

Fortuna Silver Mines Inc. (FSM)(FVI.TO) announces that it will release its financial statements and MD&A for the first quarter after the market closes on Monday, May 9, 2016.

Mines Management Inc.'s Compliance Plan Extended by NYSE MKT

MINES MANAGEMENT, INC. (NYSE-MARKET: "MGN", TSX: "MGT")(also the "Company") has received notification from the NYSE MKT (the "Exchange") stating that, in accordance with Section 1009 of the Company Guide, the Company has made a reasonable demonstration of its ability to regain compliance with Section 1003(a)(iv) of the NYSE MKT Company Guide (the "Company Guide") by the end of the revised plan period, which the Exchange has extended to be June 30, 2016.

Mines Management Inc. Reports 2015 Financial Results and Montanore Project Update

The Company's cash reserves as of December 31, 2015, are estimated to be sufficient to continue operations through the end of the first quarter of 2016. The Company is seeking financing and may consider a joint venture of the Montanore Project or other strategic alternatives. If the Company were to issue equity at the current stock price, the conversion price of the existing Series B 6% convertible preferred stock (the "preferred stock"), would be adjusted from the current $0.7866 per share downward to equal the issuance price, resulting in an increase in the number of shares of common stock issuable on conversion of the preferred stock.

Fortuna Reports Consolidated Financial Results for 2015

"Our 2015 operational and financial results reflect Fortuna´s capacity to perform soundly in a challenging metal price environment. Adjusting for a $25.0 million impairment at our Caylloma Mine, the company delivered $6.7 million of adjusted net income."

Fortuna to Release 2015 Yearend Financial Results on March 14, 2016; Conference Call at 12 p.m. Eastern on March 16, 2016

Fortuna Silver Mines Inc. (FSM)(FVI.TO) announces that it will release its financial statements and MD&A for 2015 after the market closes on Monday, March 14, 2016.

Article Comments

Sponsored Links

Live SilverSeek Map