Silver Stocks Charts, News, Reports and Quotes
VANCOUVER , Feb. 2, 2015 /CNW/ - FIRST MAJESTIC SILVER CORP. (the "Company" or "First Majestic") is pleased to announce that its audited fourth quarter and 2014 year end financial results will be released on Monday, February 23, 2015 .
Santacruz Silver Mining Ltd. (SCZ.V) (the "Company" or "Santacruz") is pleased to announce fourth quarter 2014 production of 255,487 silver equivalent ounces from the Company's Rosario Mine in San Luis Potosi, Mexico. This production represents a 32.8% quarter over quarter increase as compared with Q3 2014 silver equivalent ounces. The full calendar year of production at the Rosario Mine for 2014 resulted in 776,787 silver equivalent ounces.
Santacruz Silver Mining Ltd. ("Santacruz" or the "Company") (SCZ.V) further to the Company's press release of January 5th, 2015 in which Santacruz advised that a pipeline connecting the Rosario Mine tailings impoundment to a secondary settling pond ruptured causing water and tailings material to be discharged outside of the tailings treatment system, the Company provides the following update.
Excellon Resources Inc. (EXN.TO) (EXLLF)("Excellon" or the "Company"), Mexico's highest grade silver producer, is pleased to announce key additions to its management and technical advisory team. In an ongoing effort to continually improve operations and realize further efficiencies at the Platosa mine, the Company has engaged a team of water management consultants, including Multiurethanes Ltd., Hydro-Ressources Inc., and Technosub Inc.
Silver equivalent ("AgEq") production of 2.05 million ounces (2013 - 2.06 million AgEq Oz)Silver production of 1.2 million ounces (2013 - 1.4 million ounces)Lead production of 7.5 million lb (2013 - 7.3 million lb)Zinc production of 10.1 million lb (2013 - 9.9 million lb)
The new drill results confirm that the Bonanza and Trinidad veins and the structurally and spatially related Trinidad North Stockwork Zone all remain open to the north and to depth along the strike and plunge of the ore shoots.
Fortuna Silver Mines, Inc. (FSM)(FVI.TO)(FVI)(F4S.F) is pleased to announce 2014 production figures from its two underground operating silver mines located in Latin America, the San Jose Mine in Mexico and the Caylloma Mine in Peru. The company produced 6.6 million ounces of silver and 35.3 thousand ounces of gold or 8.7 million Ag Eq* ounces.
SilverCrest Mines Inc. (the "Company") is pleased to announce record production of 2.81 million ounces AgEq(1) for 2014, record production of 936,742 ounces AgEq(1) for the fourth quarter ("Q4") of 2014, and guidance for 2015 from its 100% owned Santa Elena Mine located in Sonora, Mexico . In 2014, the Santa Elena Mine successfully transitioned from an open pit heap leach operation to an underground mining and milling operation.
First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce the Company's fourth quarter and full year 2014 production results, as well as guidance for 2015.
Santacruz Silver Mining Ltd. ("Santacruz" or the "Company") (SCZ.V) reports that during the weekend at its Rosario Mine in San Luis Potosi, Mexico , a pipeline connecting the Rosario Mine tailings impoundment to a secondary settling pond ruptured and as a consequence water and some tailings material were discharged outside of the tailings treatment system. The Company has notified all appropriate regulatory and governmental authorities.
Subscribe to Silver Stocks Charts, News, Reports and Quotes